ABB SACE Emax 2 Series Installation, Operation And Maintenance Instructions page 79

Table of Contents

Advertisement

75 | © 2013 ABB | 1SDH001000R0002 - L7804
Continued from the previous page
Measurements history
To open the page, from the menu Measurements, you need to select History, Measurements,
and an item in the list.The page shows the history of the measurements performed for the
selected item, in the form of a histogram, and appears as follows:
Figure 75
The following table provides a description of the various areas of the page:
Pos.
Description
A
It cancels the operation, and opens the Measurements list.
B
Item selected in the Measurements list.
C
Time interval between one measurement and the next.
The quantity with which the history is displayed, and the measurement in
D
numerical form of the bar that is flashing in the histogram.
Date to which the measurement of the flashing bar refers (date set on the
E
release at the moment of the measurement).
Time to which the measurement of the flashing bar refers (time set on the
F
release at the moment of the measurement).
Histogram ordinate, with the measurements expressed as percentages of the
G
nominal value set.
H
Bars that represent the measurements of the dimension in position D.
In this page, you can do the following:
• Touch the sides of the display to scroll along the time axis, and select the bar before or
after the flashing bar.
• Return to the list Measurements.
I max
5min
Mar 04, 2013
Ekip Touch protection release | 6 - Menu
ABB | SACE Emax 2
Continued on the next page

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sace emax e2.2Sace emax e4.2Sace emax e6.2

Table of Contents