Siemens SINAMICS G150 Operating Instructions Manual page 10

Converter cabinet units 1750 kw 2700 kw
Hide thumbs Also See for SINAMICS G150:
Table of Contents

Advertisement

Table of contents
4
Electrical installation ............................................................................................................................. 61
4.1
Chapter content...................................................................................................................... 61
4.2
Checklist for electrical installation .......................................................................................... 62
4.3
Important safety precautions .................................................................................................. 68
4.4
Introduction to EMC ............................................................................................................... 69
4.5
EMC-compliant design ........................................................................................................... 71
4.6
Electrical connection .............................................................................................................. 74
4.6.1
General .................................................................................................................................. 74
4.6.2
Connecting the PE busbars ................................................................................................... 74
4.6.3
Connecting the DC link connections ...................................................................................... 77
4.6.4
Connecting the power supply and the signal cables.............................................................. 80
4.6.5
The DRIVE-CLiQ node must be connected ........................................................................... 80
4.7
Power connections ................................................................................................................. 82
4.7.1
Cable lugs .............................................................................................................................. 82
4.7.2
Connection cross-sections and cable lengths ....................................................................... 83
4.7.3
Connecting shielded three-phase current cables .................................................................. 84
4.7.4
4.7.5
Connecting the motor and power cables ............................................................................... 85
4.7.6
Adjusting the fan voltage (-T1-T10/-T20 and -T2-T10) .......................................................... 87
4.7.7
Removing the connection clip to the basic interference suppression module for
operation on an ungrounded line supply (IT system)............................................................. 89
4.7.8
Setting the circuit-breaker ...................................................................................................... 91
4.8
External supply of the auxiliary supply from a secure line ..................................................... 92
4.9
Signal connections ................................................................................................................. 93
4.9.1
Control Unit CU320-2 DP ....................................................................................................... 93
4.9.2
Customer terminal module TM31 (-A60) (option G60) ........................................................ 109
4.10
Other connections ................................................................................................................ 118
4.10.1
dv/dt filter compact plus Voltage Peak Limiter (Option L07) ................................................ 119
4.10.2
dv/dt filter plus Voltage Peak Limiter (option L10) ............................................................... 121
4.10.3
Connection for external auxiliary equipment (option L19) ................................................... 123
4.10.4
Overvoltage limitation (option L21) ...................................................................................... 125
4.10.5
4.10.6
Cabinet illumination with service socket (option L50) .......................................................... 127
4.10.7
Cabinet anti-condensation heating (option L55) .................................................................. 128
4.10.8
EMERGENCY OFF category 0; 230 V AC or 24 V DC (option L57) ................................... 129
4.10.9
EMERGENCY STOP category 1; 230 V AC (option L59) ................................................... 131
4.10.10
EMERGENCY STOP category 1; 24 V DC (option L60) ..................................................... 132
4.10.11
Braking unit 50 kW (option L62)........................................................................................... 133
4.10.11.1
Commissioning..................................................................................................................... 136
4.10.11.2
Diagnosis and duty cycles ................................................................................................... 137
4.10.11.3
Threshold switch .................................................................................................................. 138
4.10.12
Thermistor motor protection unit (option L83/L84) ............................................................... 140
4.10.13
PT100 evaluation unit (option L86) ...................................................................................... 141
4.10.14
Insulation monitor (option L87) ............................................................................................ 142
4.10.15
CBC10 CAN Communication Board (option G20) ............................................................... 144
4.10.16
Communication Board Ethernet CBE20 (option G33) ......................................................... 147
4.10.17
TM150 temperature sensor module (option G51) ................................................................ 150
10
Converter cabinet units
Operating Instructions, 07/2016, A5E03347396A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents