Starter Commissioning Tool - Siemens SINAMICS G150 Operating Instructions Manual

Converter cabinet units 1750 kw 2700 kw
Hide thumbs Also See for SINAMICS G150:
Table of Contents

Advertisement

Commissioning

5.2 STARTER commissioning tool

During initial power-up of the Control Unit and during first commissioning, parameter macros
are executed and the necessary settings made.
The settings are documented in the Appendix.
After initial power-up, first commissioning, and also following a "Parameter reset to factory
settings", individual parameter values deviate from the factory settings stated in the List
Manual.
Danger to life or malfunctions of the machine as a result of incorrect or changed
parameterization
As a result of incorrect or changed parameterization, machines can malfunction, which in
turn can lead to injuries or death.
• Protect the parameterization (parameter assignments) against unauthorized access.
• Respond to possible malfunctions by applying suitable measures (e.g. EMERGENCY
5.2
STARTER commissioning tool
Description
You can use the STARTER commissioning tool to configure and commission SINAMICS
drives and drive systems. The drive can be configured using the STARTER drive
configuration wizard.
Note
STARTER online help
This section shows you how to carry out commissioning using STARTER. STARTER
features a comprehensive online help function, which provides detailed explanations of all
the processes and available system settings.
For this reason, this section only describes the individual commissioning steps.
Prerequisite: STARTER Version
The following STARTER version is required to commission the SINAMICS with firmware
V4.8:
● STARTER V4.5.1
196
WARNING
STOP or EMERGENCY OFF).
Converter cabinet units
Operating Instructions, 07/2016, A5E03347396A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents