Siemens SINAMICS S120 Manual page 351

Air-cooled chassis power units
Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

Installing the Braking Module
Note
To install a frame size GX Braking Module in a frame size GB or GD Basic Line Module a cable
harness set is required, which is available under Article number 6SL3366-2NG00-0AA0.
The steps for the installation procedure are numbered in accordance with the diagram.
1. Unscrew the three screws of the blanking plate.
Remove the plate.
2. Insert the Braking Module where the cover used to be and secure it using the three screws
(from step 1).
3. Use the connecting cable in the cable harness set (Article number 6SL3366-2NG00-0AA0).
4. Secure the connecting cable to the DC link with two screws (Braking Module connection)
and two nuts (DC-link connection).
Note
Pay attention to the tightening torques
The tightening torques specified in the table "Tightening torques for screw connections" must
be observed.
Air-cooled chassis power units
Equipment Manual, 06/2020, 6SL3097-5AE00-0BP3
DC link components
7.1 Braking Module
349

Advertisement

Table of Contents
loading

Table of Contents