Epson RC620 Safety And Installation page 115

Hide thumbs Also See for RC620:
Table of Contents

Advertisement

S5 / PS series
Inspection points are divided into five stages: daily, four months, two years, four
years, and eight years. If the Manipulator is operated for predetermined hours of
operation, perform maintenance inspections.
Inspection
Daily
4-month
24-month
48-month
96-month
X5
Inspections
Daily
Periodical
Periodical replacement
of expendable parts
*1 Increase the frequency of inspection if your operating condition exceeds the
standard operation pattern.
*2 This check is not necessary for a motor direct mount module. (Timing belt is
not used.)
RC620 Safety and Installation Rev.8
Inspection Interval
4 months
24 months
48 months
96 months
Recommended
Intervals*1
Once a week
Loose bolts, connectors and cables
Every half year
Inspect timing belt for damage and looseness. *2
Replace cables.
Every two years
Replace timing belt. *2
Every three years Replace lithium battery.
5. General Maintenance
Hours of operation
Inspect every day
Inspection items
1000 hours
6000 hours
12000 hours
24000 hours
103

Advertisement

Table of Contents
loading

Table of Contents