GE H
EALTHCARE
D
5394141, R
IRECTION
EVISION
Chapter 2
Pre-Installation
Section 2-1
Overview
2-1-1
Purpose of chapter 2
This chapter provides the information required to plan and prepare for the installation of a LOGIQ™ P5.
Included are descriptions of the facility and electrical needs to be met by the purchaser of the unit. A
checklist is also provided at the end of this section to help determine whether the proper planning and
preparation is accomplished before the actual equipment installation is scheduled.
Table 2-1
Section
2-1
2-2
2-3
5
Contents in Chapter 2
Description
Overview
General Console Requirements
Facility Needs
Section 2-1 - Overview
LOGIQ™ P5 S
M
EVICE
ANUAL
Page Number
2-1
2-2
2-7
2-1