Asig Assy - GE LOGIQ P5 Service Manual

Hide thumbs Also See for LOGIQ P5:
Table of Contents

Advertisement

GE H
EALTHCARE
D
5394141, R
IRECTION
EVISION
8-2-35

ASIG Assy

8-2-35-1
Tools
Common pilIips screwdrivers
8-2-35-2
Preparations
Shut down the system and switch off the main breaker.
8-2-35-3
Removal procedure
1.) Remove the Side Right Cover. Refer to the
2.) Remove the EMI Cover R. Refer to the
3.) Unscrew 2 screws (1-2) and eject the PCB.
4.) Perform the following functional tests. If all are successful, include the debrief script provided below.
Table 8-36
Service Manual
Section
Section 4-3-1
Section 4-3-2
Section 4-9-16
Section 4-3-4
Section 4-3-5
Section 10-5-2
8-2-35-4
Mounting Procedure
Install the new parts in the reverse order of removal.
8-88
5
(1)
Figure 8-122 Eject the ASIG
Functional Tests
Functional Test / Diagnostic Test
Power On/Boot Up
Power Off / Shutdown
ASIG ASSY Function Validation Procedure
System B/M-Mode Checks
System CFM and PWD Checks
Functional Checks (See Also Chapter 4)
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8-2-16 "Side Right Cover" on page
8-2-27 "EMI Cover R" on page
(2)
5394141, Rev 1+, Section 8-2-35. Equipment
passed all required tests and is ready for use. "
LOGIQ™ P5 S
M
EVICE
ANUAL
8-52.
8-69.
Debrief Script
"Service Manual, Direction

Advertisement

Table of Contents
loading

Table of Contents