Software Loading Procedure; General; Parts Required; Timerequired - GE LOGIQ P5 Service Manual

Hide thumbs Also See for LOGIQ P5:
Table of Contents

Advertisement

GE H
EALTHCARE
D
5394141, R
IRECTION
EVISION
Section 8-3

Software Loading Procedure

8-3-1

General

This describes a full system software loading (Base Software Load Image + Arirang Application Load
Image) procedure.
Use this instruction when:
- Performing the HDD with new one (Base Software Load Image + Arirang Application Load Image)
- Performing the system revision-up (Application)
8-3-2

Parts Required

LOGIQ™ P5 Base Software DVD
LOGIQ™ P5 Application Software CD
Blank CD-Rs (for patient image backup) or DVDs
Service Dongle
NOTE:
Patient Image Data will be deleted when all the drives are ghosted. Back up them on the CD-
R or DVD before starting software loading
NOTE:
Insert the service dongle into this service port located at the rear panel before installing the
Base System Software Load image
8-3-3

TimeRequired

Approximately 2hours
5
Section 8-3 - Software Loading Procedure
LOGIQ™ P5 S
M
EVICE
ANUAL
8-119

Advertisement

Table of Contents
loading

Table of Contents