NEC Express5800/B120b User Manual page 127

Express5800/bladeserver series;
Table of Contents

Advertisement

4.
Check to "Make Global HSP" or select the DG you want to rebuild and check to "Make
Dedicated HSP", and then click [Go] on the lower center of the screen.
5.
When [Rebuild Progress] is displayed, click [Home] at the lower left of the screen to go
back to WebBIOS Top Menu.
IMPORTANT:
Consistency Check, Rebuild, or Reconstruction is being executed. With
the progress indication being displayed, the background task may be
processed at slow rate.
– Check to "Make Global HSP" check
– Or, select the DG that contains the
Click [Home] while the background task such as
Configuring Your Server 4-77
box.
failed hard disk drive and check to
"Make Dedicated HSP" check box.

Advertisement

Table of Contents
loading

This manual is also suitable for:

N8400-110fN8400-114f

Table of Contents