NEC Express5800/B120b User Manual page 283

Express5800/bladeserver series;
Table of Contents

Advertisement

Notes
Note the followings in the installation or removal of the mezzanine card.
Be careful not to make your hands touch the terminals of the mezzanine card slot directly.
If you do not keep it, the oil and/or dirt on the hands may adhere to the terminals to result
in contact failure.
For the optional ROMs on the unbooted LAN device, set "Disabled" with the BIOS
SETUP utility.
If a bootable mezzanine card (such as FibreChannel controller or LAN board) is installed,
check the boot priority on the [Boot] menu of the BIOS SETUP utility.
The slot number for the Type I mezzanine card is "MEZ1", and "MEZ2" for Type II
mezzanine card.
Installation
Install a mezzanine card in mezzanine card slot in the following procedure.
IMPORTANT:
I and Type II.
The Type I mezzanine card can be installed in either of connectors Type
I and Type II. The Type II mezzanine card can be installed in Type II
connector only.
To install the mezzanine card, start installation from the bottom slot (for
Type I).
NOTE:
connection port on the card engages with the connector on the
mezzanine card slot.
1.
After the shutdown processing for the CPU blade to be removed, turn off the power of the
CPU blade.
2.
Pull out the CPU blade from the Blade Enclosure.
Refer to the User's Guide of the Blade Enclosure.
3.
Place the CPU blade on anti-static sheet with little dust.
There are two types of mezzanine card for blade, Type
Before installing mezzanine card, make sure that the
Upgrading Your Server 9-21

Advertisement

Table of Contents
loading

This manual is also suitable for:

N8400-110fN8400-114f

Table of Contents