Setting Parameters - Mitsubishi Electric MELSEC iQ-R Series User Manual

Programmable controller
Hide thumbs Also See for MELSEC iQ-R Series:
Table of Contents

Advertisement

4.4

Setting Parameters

This section shows the procedure for setting parameters of this product in CW Configurator.
Creating a project
Operating procedure
1.
Start CW Configurator.
2.
Select [Project]  [New].
The "New" screen appears.
3.
Select "R102WCPU-W" for "Type."
4.
Click the [OK] button.
Setting parameters for the system and modules
Set parameters for the system and modules.
■When CW Configurator is connected to the actual system configuration
Read the actual system configuration to the module configuration diagram of CW Configurator to set parameters.
Operating procedure
1.
Select [Module Configuration] in the navigation window.
The module configuration diagram opens.
2.
Select [Online]  [Read Module Configuration from PLC].
The system parameters are set automatically, and the actual system configuration is displayed on the module configuration
diagram.
3.
Double-click a CPU module, I/O module, or intelligent function module.
The parameter editor for the module is displayed.
4.
Set parameters.
5.
Click the [Apply] button.
Precautions
An RQ extension base unit, MELSEC-Q series extension base unit, or modules mounted on these extension base units
cannot be read. For the units and modules unable to be read, create the module configuration by dragging each unit/module
from the element selection window and dropping it on the module configuration diagram.
4 PROCEDURES BEFORE OPERATION
52
4.4 Setting Parameters

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec iq-r melsecwincpu

Table of Contents