Gs4000-160E2 - Hitachi GS4000 Series Installation Manual

Hide thumbs Also See for GS4000 Series:
Table of Contents

Advertisement

GS4000 Installation Guide Revision 4.00
1.1.4

GS4000-160E2

The GS4000-160E2 has the following hardware specification.
Slot for BCU: 2 slots
Slot for PSU: 4 slots
Slot for power supply: 2 slots
Slot for a fan unit: 2 slots
(1) Outer Appearance
Front Panel
Fan Unit Slot
Rack Mounting Bracket (L)
Figure 1.1-15 GS4000-160E2 Front View
*
1-18
NOTE: The standard and high port-density NIFs, are installed into a packet switching
unit(PSU). The high port-density PSU-integrated NIF is installed into the slot for the
packet switching unit.
For details, see the section "1.5 Packet Switching Module" and "1.6 Network
Interface Module".
Rack Mounting Bracket (R)
PSU Slot
BCU Slot
PSU Slot
520-10-026-30X

Advertisement

Table of Contents
loading

Table of Contents