Huawei DBS3900 Installation Manual page 120

Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 (Ver.B)
Installation Guide
Step 3 If one more APM30H and one more IBBS200D or IBBS200T are configured, install two more
monitoring signal cables, as shown in
1.
2.
Issue 06 (2011-09-15)
Figure 6-100 Installing a monitoring signal cable between the APM30H and the IBBS200T
Connect one end of a monitoring signal cable between the BBU in the APM30H and the
CMUA in the extended APM30H to the MON0 port on the UPEU in the BBU, and then
connect the other end to the COM_IN port on the CMUA.
Connect one end of a monitoring signal cable between the extended APM30H and the
IBBS200D or IBBS200T under the APM30H to the COM_IN port on the CMUA on the
cabinet door of the IBBS200D or IBBS200T, and then connect the other end to the
COM_485 port on the PMU in the APM30H.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 Outdoor Scenario with AC Power Supply (BBU Installed
Figure
6-101.
in an APM30H)
107

Advertisement

Table of Contents
loading

Table of Contents