Huawei DBS3900 Installation Manual page 518

Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 (Ver.B)
Installation Guide
Figure 14-4 Drilling holes on the concrete pad
(1) Concrete pad (2) Base of the
1.
2.
3.
4.
5.
Issue 06 (2011-09-15)
cabinet
Use a hammer drill with bit 16 to drill holes at the anchor points, and ensure that the depth
of each hole ranges from 52 mm to 60 mm.
CAUTION
l Do not drill holes through the holes in the base by using a hammer drill. Drilling holes
through the holes in the base may damage the paint on the base.
l Take proper safety measures to protect your eyes and respiratory tract against the dust
before drilling holes.
Use a vacuum cleaner to clear the dust inside and around the holes. If the inter-hole spacing
is too wide or too narrow, locate and drill holes again.
Slightly tighten the expansion bolt, and then put the expansion bolt assembly into the hole
vertically.
Use a rubber mallet to hammer the expansion bolt until the expansion tube is buried into
the hole, and then tighten the bolt.
Remove the bolt, spring washer, and flat washer counterclockwise.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
14 Indoor Scenario with DC Power Supply (BBU Installed
(3) M12x60 bolt (4) Spring washer (5) Flat washer (6) Expansion tube
Indoors and RRU Powered Outdoors)
505

Advertisement

Table of Contents
loading

Table of Contents