Step 4 Use a level to check that the two anchor holes on the marking template are on a horizontal plane,
place the marking template against the wall, and then use a marker to mark anchor points, as
shown in
Holes marked "B" are used as anchor points. The distance between the marking plate and the
ground is 1000-1200 mm.
Figure 13-22 Marking anchor points
(1) Level
The bolts in the wall must bear a stress of a minimum of 1.25 kN.
Step 5 Drill holes at the anchor points, and then install expansion bolt assemblies, as shown in
the IMB03 on the Wall
Step 6 Place the IMB03 onto the two bolts at the upper anchor points, and then use a torque wrench to
pre-tighten the two bolts until a 20-30 mm length of each bolt is reserved out of the wall, as
shown in
Issue 06 (2011-09-15)
Figure
13-22.
CAUTION
(Side-Mounted).
Figure
13-23.
TIP
Tighten the two bolts at the lower anchor points prior to the bolts at the upper anchor points, and ensure
that the subrack is vertical.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
13 Indoor Scenario (BBU Installed in an IMB03)
(2) Anchor holes
Installing
449

Advertisement

Table of Contents
loading

Table of Contents