Installation Guide
Figure 6-120 Installing monitoring signal cables in a scenario of two APM30Hs+two
IBBS200Ds/IBBS200Ts+one TMC11H
Step 5 Route the cable by referring to
cable.
Step 6 Label the installed cables. For details, see Attaching an L-Shaped Label.
Step 7 Run each cable that leaves the cabinet in the PVC corrugated pipe, and then tie the pipe to the
cable hole in the cabinet.
----End
Installing Monitoring Signal Cables in a Scenario of one APM30H+two
IBBS200Ds/IBBS200Ts+one TMC
If a DBS3900 is configured with one APM30H, one TMC, and two IBBS200Ds or IBBS200Ts,
monitoring signal cables between the CMUA and the BBU in the APM30H, between the
APM30H and the IBBS200D or IBBS200T under the APM30H, between the cascaded CMUAs
in the two IBBS200Ds or IBBS200Ts, and between the BBU in the APM30H and the CMUA
Issue 06 (2011-09-15)
6 Outdoor Scenario with AC Power Supply (BBU Installed
6.5.1 Cabling
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Requirements, and then use cable ties to bind the
in an APM30H)