Figure 9-26 Installing a ground clip
Step 3 Route the cable by referring to
cable.
Step 4 Label the installed cables. For details, see Attaching an L-Shaped Label.
----End
Installing a FE/GE Surge Protection Transfer Cable
A FE/GE surge protection transfer cable connects a transmission board and the UFLP,
transferring surge protection transfer signals.
Procedure
Step 1 Install a FE/GE surge protection transfer cable, as shown in
1.
2.
Issue 06 (2011-09-15)
Link the RJ-45 connector at one end of the FE/GE surge protection transfer cable to the
FE0 port on the GTMU or WMPT or FE/GE port on the UTRP9 in the BBU.
Connect the other end to the FE0 or FE1 port near the INSIDE label on the UFLP in the
BBU.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
9 Outdoor Scenario with DC Power Supply (BBU Installed
9.4.1 Cabling
Requirements, and then use cable ties to bind the
in an OMB)
Figure
9-27.
313

Advertisement

Table of Contents
loading

Table of Contents