Huawei DBS3900 Installation Manual page 366

Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 (Ver.B)
Installation Guide
Figure 10-26 Installing a ground clip
Step 3 Route the cable by referring to
the cable.
Step 4 Label the installed cables. For details, see Attaching an L-Shaped Label.
----End
Installing a FE/GE Surge Protection Transfer Cable
A FE/GE surge protection transfer cable connects a transmission board and the UFLP,
transferring surge protection transfer signals.
Procedure
Step 1 Install a FE/GE surge protection transfer cable, as shown in
1.
2.
Issue 06 (2011-09-15)
Link the RJ-45 connector at one end of the FE/GE surge protection transfer cable to the
FE0 port on the GTMU or WMPT or FE/GE port on the UTRP9 in the BBU.
Connect the other end to the FE0 or FE1 port near the INSIDE label on the UFLP in the
BBU.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
10 Outdoor Scenario with AC Power Supply (BBU Installed
10.4.1 Cabling
Requirements, and then use cable ties to bind
in an OMB)
Figure
10-27.
353

Advertisement

Table of Contents
loading

Table of Contents