Step 3 Install a GPS clock signal cable.
1.
2.
Step 4 Install a WGRU power cable.
A 2-hole male connector is added to one end of a WGRU power cable, and you only need to add an OT terminal
at the other end.
1.
2.
Issue 06 (2011-09-15)
Figure 12-7 Installing a WGRU PGND cable
NOTE
The WGRU PGND cable is connected to the closest ground bar.
Route the cable by referring to
bind the cable.
Link the N-type female connector at one end of the GPS clock signal cable to the ATN port
on the back panel of the WRGU, and then link the SMA male connector at the other end
to the GPS antenna, as shown in
Figure 12-8 Installing a GPS clock signal cable
Route the GPS clock signal cable upwards along the column of the cabinet, and then use
cable ties to bind the cable securely. For details, see
NOTE
Cut the cable to the required length based on the actual cable route.
Add an OT terminal to one end of the cable. For details, see Assembling the OT Terminal
and the Power Cable.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
12 Indoor Scenario with DC Power Supply (BBU Installed in
12.4.1 Cabling
Requirements, and then use cable ties to
Figure
12-8.
12.4.1 Cabling
a 19-Inch Rack)
Requirements.
409

Advertisement

Table of Contents
loading

Table of Contents