DBS3900 (Ver.B)
Installation Guide
Step 5 Route the cable by referring to
cable.
Step 6 Label the installed cables by referring to Attaching a Sign Plate Label.
Step 7 Run each cable that leaves the cabinet in the PVC corrugated pipe, and then tie the pipe to the
cable hole in the cabinet.
----End
Installing Power Cables Between the APM30H and the IBBS200T
Power cables between the APM30H and the IBBS200T feed power into an IBBS200T and its
components from an APM30H. The cables are optional, which are delivered and used with an
IBBS200T.
Prerequisite
l
l
Context
According to backup power requirements of customers, the configuration proportion of
APM30Hs and IBBS200Ts can be 1:1 or 1:2.
The power cables between the APM30H and the IBBS200T are the power cables for the batteries,
cascaded batteries, and TEC in the IBBS200T.
Table 6-8 Power cables between the APM30H and the IBBS200T
Cable
Power cable for
the batteries
Issue 06 (2011-09-15)
Figure 6-76 Incorrect connections of the heating-film power cable in the junction box in
the IBBS200D
The tools, such as a Phillips screwdriver, cable cutter, and multi-purpose crimping tool, are
ready.
The PGND cable is installed.
RTN(+) wire
NEG(-) wire
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 Outdoor Scenario with AC Power Supply (BBU Installed
6.5.1 Cabling
Requirements, and then use cable ties to bind the
Table 6-8
One End
Power series
120 connector
in an APM30H)
lists the cable specifications.
The Other
Remarks
End
OT terminal
Red
2
(M6, 16 mm
)
OT terminal
Black
2
(M6, 16 mm
)
83