Huawei DBS3900 Installation Manual page 127

Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 (Ver.B)
Installation Guide
Figure 6-108 Installing a monitoring signal cable in the scenario of two APM30Hs+four
IBBS200Ds/IBBS200Ts
(1) Monitoring signal cable between
the APM30H and the IBBS200D/
IBBS200T
Step 5 Route the cable by referring to
cable.
Step 6 Label the installed cables. For details, see Attaching an L-Shaped Label.
Step 7 Run each cable that leaves the cabinet in the PVC corrugated pipe, and then tie the pipe to the
cable hole in the cabinet.
----End
Installing Monitoring Signal Cables in a Scenario of one APM30H+one TMC11H
If a DBS3900 is configured with one APM30H and one TMC11H, monitoring signal cables
between the CMUA and the BBU in the APM30H and between the BBU in the APM30H and
the CMUA in the TMC11H must be installed. If one more APM30H is configured, one more
monitoring signal cable is required.
Issue 06 (2011-09-15)
6 Outdoor Scenario with AC Power Supply (BBU Installed
(2) Monitoring signal cable between
the cascaded CMUAs
6.5.1 Cabling
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
(3) Monitoring signal cable between
the CMUA and the BBU
Requirements, and then use cable ties to bind the
in an APM30H)
114

Advertisement

Table of Contents
loading

Table of Contents