DBS3900 (Ver.B)
Installation Guide
Before a DBS3900 starts operating, you must check the power-on status of the cabinet and
components in it.
14.8 Subsequent Operations
You must perform subsequent operations after installing a base station and checking related
hardware installation.
Issue 06 (2011-09-15)
14 Indoor Scenario with DC Power Supply (BBU Installed
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Indoors and RRU Powered Outdoors)
501