Installation Process - Huawei DBS3900 Installation Manual

Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 (Ver.B)
Installation Guide

6.1 Installation Process

When a DBS3900 is deployed outdoors with AC power supply, and the BBU is installed in an
APM30H, you must install the APM30H, components in it, and related cables. In addition, some
optional components may be required based on actual requirements.
Figure 6-1
Issue 06 (2011-09-15)
shows the installation process.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 Outdoor Scenario with AC Power Supply (BBU Installed
in an APM30H)
28

Advertisement

Table of Contents
loading

Table of Contents