Huawei DBS3900 Installation Manual page 40

Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 (Ver.B)
Installation Guide
Check the installation items, installation environment, and cable-related items after the cabinets
and devices are all installed.
6.8 Power-On Check
Before a DBS3900 starts operating, you must check the power-on status of the cabinet and
components in it.
6.9 Subsequent Operations
You must perform subsequent operations after installing a base station and checking related
hardware installation.
Issue 06 (2011-09-15)
6 Outdoor Scenario with AC Power Supply (BBU Installed
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
in an APM30H)
27

Advertisement

Table of Contents
loading

Table of Contents