Huawei DBS3900 Installation Manual page 532

Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 (Ver.B)
Installation Guide
Figure 14-26 Installing a fastening bar
(1) Fastening bar
Step 6 Lift the cabinet onto the trapezoidal rack, use four M12×30 bolts to secure the cabinet on the
trapezoidal rack, and then use a socket wrench to tighten the bolts, as shown in
Do not move the cover plates for the round cable holes to avoid entry of water into the cabinet.
Figure 14-27
Figure 14-27 Positions of the cover plates for the round cable holes
Issue 06 (2011-09-15)
CAUTION
shows the positions of the cover plates for the round cable holes.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
14 Indoor Scenario with DC Power Supply (BBU Installed
Indoors and RRU Powered Outdoors)
Figure
14-28.
519

Advertisement

Table of Contents
loading

Table of Contents