8.1 Installation Process

When a DBS3900 is deployed outdoors with AC power supply and the BBU is installed in a
+24 V DC APM30H, you must install the APM30H, components in it, and related cables on
site. In addition, some optional components may be required based on actual requirements.
Figure 8-1
Issue 06 (2011-09-15)
shows the installation process.