Figure 13-55 Cable connections in the AC power supply scenario
l You may need to prepare cables according to actual cable routes during the cable installations.
l Attach engineering labels to both ends of the cable after each cable is installed.
l When routing the power cable and PGND cable on the bottom of the IMB03, ensure that the
l When the IMB03 is installed on the wall, the distance between the E1/T1 cable and the GPS
Issue 06 (2011-09-15)
CAUTION
holes for heat dissipation are not covered.
clock signal cable must be not less than 10
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
13 Indoor Scenario (BBU Installed in an IMB03)
mm.Figure 13-56
shows cable routes.