DBS3900 (Ver.B)
Installation Guide
14.1 Installation Process
When a DBS3900 is deployed indoors with DC power supply, the BBU is installed indoors, and
RRUs obtain outdoor power supply, you must install a cabinet, components in it, and related
cables.
Figure 14-1
Figure 14-1 Installation process
Issue 06 (2011-09-15)
shows the installation process.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
14 Indoor Scenario with DC Power Supply (BBU Installed
Indoors and RRU Powered Outdoors)
502