Installation Process - Huawei DBS3900 Installation Manual

Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 (Ver.B)
Installation Guide

14.1 Installation Process

When a DBS3900 is deployed indoors with DC power supply, the BBU is installed indoors, and
RRUs obtain outdoor power supply, you must install a cabinet, components in it, and related
cables.
Figure 14-1
Figure 14-1 Installation process
Issue 06 (2011-09-15)
shows the installation process.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
14 Indoor Scenario with DC Power Supply (BBU Installed
Indoors and RRU Powered Outdoors)
502

Advertisement

Table of Contents
loading

Table of Contents