This chapter explains how to operate each measurement program. Be sure you understand the general
operation procedures described in this chapter.
3-1
Area measurement by binary conversion
3-2
Position measurement
3-3
Degree of match inspection for shape and size
3-4
Distance measurement
3-5
Lead inspection
3-6
Existence inspection by point measurement
3-7
Position correction (example of point measurement)
3-8
Use of numeric caluculations (example of shape and size inspection)
[Preparation for operation]
(1) Connection
Before turning ON the power, connect the IV-S20 main housing, the camera, monitor, remote key
pad and power supply (24 VDC). Connect the camera to the camera 1 connector (CAMERA 1) on
the main housing.
See Chapter 6 "Installation Conditions and Method" for connecting procedures.
Camera 1
Remote setting key pad
(2) Turning ON the power
Turn ON the monitor and the 24 VDC power supply.
The monitor displays the MAIN OPS MENU. (It does not show any images.)
[Procedure for complete initialization]
In sections 3-1 to 3-6, the programs are discussed in their initial configuration.
Before starting any program, perform the following "total initialization" operation.
1. On the MAIN OPS MENU (see the following page), move the cursor to SET-SCRN item using
the left and right keys, and press the SET key.
- The [SYSTEM SETUP] menu will appear.
[SYSTEM SETUP]
1OPS MENU SETTING (TO NEXT SUB-MENU)
2OBJECT TYPE COND (TO NEXT SUB-MENU)
3I/O CONDITIONS
4ADJ. CAM POSITION (TO NEXT SUB-MENU)
5DISPLAY MODE
6RECEIVING PARMS
7INIT ALL PARMS
2
8SELF DIAGNOSTICS EXEC
9SAVE IN FLASH MEM EXEC
0OPERATIONS
2. Move the cursor to 7 INIT ALL PARMS (total initialization) using the up and down keys, and
press the SET key.
- The INITIALIZE DATA? message will be displayed on the upper area of the screen.
3. Press the SET key. - The system will be initialized.
4. Press the ESC key. - The display will return to the MAIN OPS MENU without initialization.
Operation Examples (Area measurement by binary conversion)
Item
IV-S20 main housing
Power supply (24 VDC)
(TO NEXT SUB-MENU)
JAPANESE ENGLISH
EXEC
EXEC
3-1
Page
3·2 to 7
3·8 to 14
3·15 to 21
3·22 to 30
3·31 to 37
3·38 to 43
3·44
3·45 to 49
Monitor
3

Advertisement

Table of Contents
loading

Table of Contents