Mitsubishi Electric melsec q00ujcpu User Manual page 170

Programmable controller
Hide thumbs Also See for melsec q00ujcpu:
Table of Contents

Advertisement

(c) With link dedicated instructions of the CC-Link IE controller network module or
MELSECNET/H module
The remote RUN/STOP operation by link dedicated instructions of the CC-Link IE controller network
module or MELSECNET/H module can change the RUN/STOP status of the CPU module.
For details, refer to the following.
Reference manual of each network module
(5) Precautions
Pay attention to the following since the STOP status is given priority over the RUN status.
(a) Timing of changing to the STOP status
The operating status of the CPU module is changed to STOP when the remote STOP operation is
performed from any one of the following: RUN contact, GX Developer, or an external device using
the MC protocol.
(b) When changing the status back to RUN
To change the operating status back to RUN after the CPU module status was changed to STOP by the remote
STOP operation, perform the remote RUN operation in the same order for the remote STOP operation.
The definitions of the RUN/STOP status are described below.
• RUN status•••A status where sequence program operations are repeatedly performed in a loop between the step
0 and the END or FEND instruction.
• STOP status•••A status where sequence program operations are stopped. All outputs (Y) are turned off.
After being reset, the operating status of the CPU module becomes the one set with the RUN/STOP
switch.
CHAPTER6 FUNCTIONS
6 - 19
1
2
3
4
5
6
7
8

Advertisement

Table of Contents
loading

Table of Contents