(5) Execution
Measure the scan time by the following procedure.
• Display the start of the ladder program where scan time is measured in GX Developer and set the monitor
mode.
• Select [Online]
• Enter the start and end steps and click the
Example
Remark
When displaying the Scan time measurement screen after specifying the scan time measurement rage in the monitor
mode, the start and end steps are set in the specified range.
To specify the range, press the "Shift" key and click the mouse (The specified part is inverted).
50
52
104
106
6 - 74
[Monitor]
[Scan time measurement] to open the Scan time measurement screen.
When the start step is 52 and the end step is 105
Figure 6.62 Scan time measurement screen
Y20
Y21
Y22
Figure 6.63 Measurement range specification
button.
Start
M0
M1
M2
END