Huawei 3900 Series Commissioning Manual page 138

Multi-mode base station
Hide thumbs Also See for 3900 Series:
Table of Contents

Advertisement

6 Commissioning the MBTS by Using USB and M2000
Downloading the data
configuration file from the
USB storage device
Activating the software
Activating the data
configuration file
Resetting the base station
Base station operating
normally
Do not remove the USB storage device or reset the eNodeB during the download or activation
of eNodeB software and data configuration through the USB storage device. After the files are
downloaded, the eNodeB automatically activates the software and data configuration. Then, the
eNodeB resets.
Step 4 When the download and activation are successful, unplug the USB storage device, and proceed
with checking the status of the LEDs and rectifying the faults.
----End
Postrequisite
The eNodeB software package contains the LMT software. To reduce the eNodeB deployment
duration, some of the files of the LMT software are automatically downloaded to the eNodeB
four hours after the eNodeB deployment. If you need to use the LMT immediately after the
eNodeB deployment, run the SPL SOFTWARE command on the M2000 after the eNodeB is
connected to the M2000. Set Delay Download File Supply Flag to YES(Supply File that
Support Delay). Thus, the remaining files of LMT software are downloaded to the eNodeB.
6-20
Status of the LED on
the USB Storage
Device
Blinking
On
On
On, and then off
Off
WARNING
CAUTION
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3900 Series Multi-Mode Base Station
Commissioning Guide
Status of the RUN LED on the
LMPT
Blinking (on for 0.125s and off for
0.125s)
Blinking (on for 0.125s and off for
0.125s)
Blinking (on for 0.125s and off for
0.125s)
On, and then blinking (on for 0.125s
and off for 0.125s)
Blinking (on for 1s and off for 1s)
Issue 02 (2010-07-30)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents