Table 5-5 Enodeb Health Checklist - Huawei 3900 Series Commissioning Manual

Multi-mode base station
Hide thumbs Also See for 3900 Series:
Table of Contents

Advertisement

3900 Series Multi-Mode Base Station
Commissioning Guide

Table 5-5 eNodeB health checklist

Check Item
eNodeB software
version check
Environment status
check
eNodeB type check
Data configuration
check
Cell status check
MBTS alarm check
Issue 02 (2010-07-30)
Check Sub-Item
eNodeB software version check
RRU temperature check
Environment temperature and
humidity check
eNodeB type check
Consistency check on the data
configuration
Active alarm query
Cell status check
Inter-system communication
alarm check
Inter-system BBU board
parameter settings conflict alarm
check
Inter-system cabinet
configuration conflict alarm
check
Inter-system monitoring device
parameter settings conflict alarm
check
Inter-system board object
configuration conflict alarm
check
Inter-system RF unit parameter
settings conflict alarm check
Inter-system site-level
configuration conflict alarm
check
Inter-system control rights
conflict alarm check
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5 Commissioning the MBTS in GL or UL Mode on the
Description
Check the active eNodeB
software, including the version
and running status.
Check the temperature of the
RRU.
Check the temperature and
humidity of the environment.
Check the eNodeB type in data
configuration.
Check the consistency between
the effective data applied to
modules and the configured data
in the database.
Check for active alarms of an NE.
Check the cell status.
Check the status of inter-system
communication.
Check the consistency of inter-
system parameter settings for the
BBU board.
Check the consistency of inter-
system configurations for the
cabinet.
Check the consistency of inter-
system parameter settings for the
monitoring device.
Check the consistency of inter-
system configurations for the
board object.
Check the consistency of inter-
system parameter settings for the
RF unit.
Check the consistency of inter-
system configurations on site
level.
Check the consistency of inter-
system control rights.
M2000
5-39