Monitoring The Enodeb Commissioning Task; Viewing The Enodeb Commissioning Progress; Table 5-4 Automatic Enodeb Commissioning Process - Huawei 3900 Series Commissioning Manual

Multi-mode base station
Hide thumbs Also See for 3900 Series:
Table of Contents

Advertisement

5 Commissioning the MBTS in GL or UL Mode on the
M2000
l
l
----End

5.7 Monitoring the eNodeB Commissioning Task

This section describes how to monitor an eNodeB commissioning task. By monitoring the
eNodeB commissioning task, you can learn the eNodeB commissioning progress and status, and
then perform operations on the eNodeB commissioning task.

5.7.1 Viewing the eNodeB Commissioning Progress

After the eNodeB commissioning task is created, the user can view the task progress and related
information to handle problems during the eNodeB commissioning.
5.7.2 Pausing/Retrying the eNodeB Commissioning Task
During the automatic eNodeB commissioning on the M2000, the commissioning task can be
paused and retried as required.
5.7.3 Restarting/Deleting the eNodeB Commissioning Task
During the automatic eNodeB commissioning on the M2000, a commissioning task can be
deleted and a terminated commissioning task can be restarted as required.
5.7.1 Viewing the eNodeB Commissioning Progress
After the eNodeB commissioning task is created, the user can view the task progress and related
information to handle problems during the eNodeB commissioning.
Prerequisite
The eNodeB commissioning task is created.
Context
Table 5-4

Table 5-4 Automatic eNodeB commissioning process

eNodeB
Commiss
ioning
Process
Automatic
deploymen
t
5-32
You can choose Restart to perform the commissioning task again.
You can choose Delete to delete this task.
describes the automatic eNodeB commissioning process.
Description
After the eNodeB ESN and imported EDS file are bound together, the M2000
automatically allocates the IP address for the eNodeB. In this way, the OM
channel can be established automatically between the M2000 and the eNodeB
for remote commissioning and routine maintenance.
After the M2000 discovers an eNodeB, the M2000 automatically sets the
eNodeB to TESTING mode. Thus, all alarms generated during the eNodeB
commissioning are not reported on the M2000.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3900 Series Multi-Mode Base Station
Commissioning Guide
Issue 02 (2010-07-30)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents