7 Commissioning the MBTS by Using Local Maintenance
Terminal and M2000
Figure 7-9 Configuring the MRFU
Step 5 Set Card No., Chain No., and Hop for the MRFU in the Deploy RXU dialog box.
Step 6 In the Deploy RXU dialog box, click OK. The configuration of a new MRFU is complete.
Double-click GTMU. The Topology Configuration window is displayed, as shown in
7-10.
Figure 7-10 Topology Configuration window
Step 7 Click Close. The Board Configuration window is displayed. Right-click an idle slot, and then
choose the board to be configured from the shortcut menu.