LG MULTI V ARNU07GTUA4 Engineering Product Data Book page 102

Hide thumbs Also See for MULTI V ARNU07GTUA4:
Table of Contents

Advertisement

Indoor unit
10. Installation
10.2 Ceiling opening dimensions and hanging bolt location
• The dimensions of the paper pattern for installation are the same as those of the ceiling opening dimensions.
Ceiling
TQ/TR Chassis
585~660(Ceiling opening)
517
461
CAUTION
• This air-conditioner uses a drain pump.
• Install the unit horizontally using a level gauge.
• During the installation, care should be taken not to
damage electric wires.
Level gauge
570
Unit:mm
Ceiling board
TM/TN/TP Chassis
875(Ceiling opening)
787(Hanging bolt)
840 Unit size
• Select and mark the position for fixing bolts and pip-
ing hole.
• Decide the position for fixing bolts slightly tilted to
the drain direction after considering the direction of
drain hose.
• Drill the hole for anchor bolt on the wall.
Ceiling Cassette 4-way
Unit:mm
_ 39

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Multi v arnu09gtua4Multi v arnu12gtua4Multi v arnu18gtta4Multi v arnu24gtta4Multi v arnu09gtla4Multi v arnu12gtla4 ... Show all

Table of Contents