Indoor unit
11. Installation
11.3 Ceiling dimension and hanging bolt location
Installation of Unit
Install the unit above the ceiling correctly.
CASE 1
POSITION OF SUSPENSION BOLT
• Apply a joint-canvas between the unit and duct to
absorb unnecessary vibration.
Dimension
A
B
C
Capacity(Btu/h)
BR Chassis
1282 1230
477
(48k)
Dimension
A
B
C
D
Capacity(Btu/h)
B8 Chassis
1622 1565 580 292 695 1400 460 1122 1680 390 445 15
(76/96k)
CASE 2
• Install the unit leaning to a drainage hole side as a fig-
ure for easy water drainage.
POSITION OF CONSOLE BOLT
• A place where the unit will be leveled and that can
support the weight of the unit.
• A place where the unit can withstand its vibration.
• A place where service can be easily performed.
(Unit:mm)
D
E
F
(G)
H
56
590
30
120 1006 294
(Unit:mm)
E
F
G
H
I
J
K
BR Chassis (48k)
I
Drainage hole
B8 Chassis (76/96k)
L
E C
G D
A
B
(G)
H
A
K
B
J
F
H
I
M10 Nut
X 4
M10 washer
X 4
M10 washer
X 4
M10 Nut
X 8
_ 21
Fresh Air Intake Unit
L