Siemens SICHARGE UC Installation And Commissioning Manual page 11

Hide thumbs Also See for SICHARGE UC:
Table of Contents

Advertisement

SICHARGE UC Charger
3.2 Installation
Figure 3-2
No.
20
Open the cabinet door. To prevent the door from closing suddenly, fix it in place with suitable
aids.
21
Get down the charging station smoothly and vertically, guiding the cables through the openings
22
Make sure that the foundation anchors are guided through the drill holes of the charging station
23
Get down the charging station smoothly and vertically until it touches the foundation base
24
On each side, screw the charging station to the foundation in at least 4 of the 8 holes (at least one
per corner)
25
Tighten the screws - Tightening torque: 81 Nm
26
Remove the transport aids
27
Guide all cables used through the cable glands of the cable gland plate
10
Inserting the connecting cable into the cabinet
Checklist item
Installation and Commissioning Checklist for SICHARGE UC
Product Information, 03/2023, A5E52548271-AA
P
F
N/A

Advertisement

Table of Contents
loading

Table of Contents