Siemens SICHARGE UC Installation And Commissioning Manual page 67

Hide thumbs Also See for SICHARGE UC:
Table of Contents

Advertisement

SICHARGE UC MastPanto
6.2 Installation
① Fixing screws
② Connecting rod
③ Fork head
④ Safety cotter pin
Figure 6-10
No.
4
Position the fork head at the connecting rod mounting point
5
Insert the fork head bolt through the fork head and connecting rod mounting point
6
Install the washer on the fork head bolt
7
Insert the safety cotter pin through the hole of the fork head bolt
8
Bend both pins of the safety cotter pin
9
Repeat steps 4 - 8 at the other mounting points
10
Loosen the fixing screws
11
Loosen the lock nuts of the turnbuckles
12
Align the cantilever arm with a level by rotating the turnbuckles
The cantilever arm is aligned in X and Y direction with the two connecting rods
13
Loosen the sling gear and check the alignment. Correct the alignment, if necessary
14
Tighten the lock nuts at the connecting rods
15
Tighten the fixing screws with a torque of 400 Nm
66
Mounting the connecting rods
Checklist item
⑤ Fork head bolt
⑥ Washer
⑦ Lock nut
⑧ Turnbuckle
Installation and Commissioning Checklist for SICHARGE
UC Product Information, 03/2023, A5E52548271-AA
P
F
N/A

Advertisement

Table of Contents
loading

Table of Contents