Siemens SICHARGE UC Installation And Commissioning Manual page 78

Hide thumbs Also See for SICHARGE UC:
Table of Contents

Advertisement

No.
4
Check the correct setup of y-sensor. If the bus stops outside the tolerances of the y sensor setup,
make sure that charging is not possible and the green LED on the mast is flashing
5
Check the correct position of the Pantograph with bus by lowering the Pantograph via manual
mode.
6
Check the Pantograph heating
7
Shut down the Pantograph during a charging session manually (charge stop button). Ensure that
HMI signals that charge stop is pressed and status LED turns off
8
Check the internet connection
9
Check the backend connection
Connections for the DC cables
No.
1
Park the vehicle under the MastPanto and start the charging process. - "Initialization" message
appears on HMI at charger
2
Ensure that the Pantograph moves down and makes contact. - "Cable check and precharge" mes-
sage appears on HMI at charger and the sequence starts
3
"Charging" message appears on HMI. Current is applied to the vehicle, according to its requests.
4
Press the "Stop Charging" button on the screen. - The Pantograph will move up
5
Download the session log from the UI and check the log for session data and attach to the report
Comments and findings:
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Responsible person
(optional) Customer
Please take into consideration that the document is only valid after signatures of technician or if included in the final
document delivered to the customer.
Installation and Commissioning Checklist for SICHARGE UC
Product Information, 03/2023, A5E52548271-AA
Checklist item
Checklist item
Name
Function
SICHARGE UC MastPanto
6.4 Commissioning
P
F
N/A
P
F
N/A
Signature
77