6.4 Commissioning

6.4
Commissioning
Note
Take into consideration the steps in the charger's commissioning log to complete the
installation
Adjusting the Pantograph
Note
The conditions on site are entered when you place your order. The Pantograph is configured
at the factory using these specifications. Only adjust the Pantograph if the factory setting is
not correct
No.
1
Mark the original position of the anchor points
2
Loosen the cable fixing at the cable entries
3
Loosen the screws of the anchor points
Figure 6-12
No.
4
Move the Pantograph on the C mounting rail crosswise to the road
74
Checklist item
Anchor point of the pantograph
Adjusting the pantograph - Overview
Checklist item
Installation and Commissioning Checklist for SICHARGE
UC Product Information, 03/2023, A5E52548271-AA
P
F
N/A
P
F
N/A