Connecting the PE conductor
No.
1
Loosen the 4 screws of the summation current transformer plate (if this option is installed).
2
Remove the summation current transformer with plate to expose the earth connection.
3
Remove the sheath of the power cable to a length of approx. 20 cm.
4
Select an M8-size cable lug for the corresponding conductor cross-section.
5
Strip the insulation from the end of the conductor so that the remaining insulation extends up to
the cable lug.
6
Fasten the cable lug correctly to the end of the conductor.
7
Put the cable lug onto the bolt of the cabinet's PE earth connection ⑥.
8
Tighten the fastening nut with the required torque:
Size of fastening nut: M8
Required tightening torque: 20 Nm (±10%)
9
Mount the summation current transformer with plate (if this option is installed).
Connect conductors L1, L2, L3
No.
1
Strip the insulation from the conductor end, ensuring that no copper protrudes from the main
switch.
2
Feed the cables through the summation current transformer.
3
Insert the conductor end into the terminal of the main switch.
4
Tighten the terminal with the required tightening torque of 42.4 Nm (±10%).
Sealing
No.
1
Seal cable openings and other openings with permissible sealing material. Permissible sealing
material includes silicone and soft PU foam.
Installation and Commissioning Checklist for SICHARGE UC
Product Information, 03/2023, A5E52548271-AA
Checklist item
Checklist item
Checklist item
SICHARGE UC Charger
3.3 Connection
P
F
N/A
P
F
N/A
P
F
N/A
13