No.
12
The charger to be commissioned has a LED indicator.
13
The charger to be commissioned has RFID card reader.
14
The charger to be commissioned is to be connected to one dispenser.
15
The charger to be commissioned is to be connected to multiple dispensers.
16
The charger to be commissioned will use ModBus as interface to the backend.
17
It is known which HMI software configuration has to be used in the charger configuration.
18
In case of a system with multiple dispensers, it is known the priority sequence to be used in the
charger configuration.
19
Access to customer data required to complete the commissioning log is guaranteed.
20
Access of commissioning team to the important contacts (Customer, Customer support, installa-
tion responsible, project manager ...) for the commissioning action is guaranteed.
21
Access to a Multimeter is guaranteed.
22
Access to a Clamp Meter is guaranteed.
23
Access to a CCS compliant EV with SoC lower than 60% is guaranteed.
Ensure safety
No.
1
All safety notes and actions to avoid risks at each step of the commissioning action are known.
2
The charger is mounted in a place where it can be used safely.
3
A check has done to the site and the commissioning process can proceed without any apparent
risk.
4
All tools have been verified and can be used safely.
Optical check
No.
1
The installation log is correctly fill in and no failures have been observed.
2
The charger serial number on installation log is the right one.
3
Bumper was installed as indicated in the operating manual.
4
The charger don't shows any signs of damage.
5
To ensure operation, maintenance and ventilation of the charging station the minimum clearances
was respected as indicated in the operating manual.
6
There are no obstacles to the airflow of charger ventilation system.
7
Take pictures from the installation, equipment and Name Plate.
Installation check
No.
1
The main circuit breaker of external switchboard is turned OFF.
2
The LOTO device was applied to the main circuit breaker of the external distribution board to avoid
an accidental electrical reconnection.
3
The main circuit breaker of external switchboard has parameters according to specification [ Ir=
280A; Ii=1600A; ln= 228A ]
4
The charger main circuit breaker of charger is turned OFF.
Installation and Commissioning Checklist for SICHARGE UC
Product Information, 03/2023, A5E52548271-AA
Checklist item
Checklist item
Checklist item
Checklist item
SICHARGE UC Charger
3.5 Commissioning
P
F
N/A
P
F
N/A
P
F
N/A
P
F
N/A
23

Advertisement

Table of Contents