Siemens SICHARGE UC Installation And Commissioning Manual page 50

Hide thumbs Also See for SICHARGE UC:
Table of Contents

Advertisement

UC150 parent charging station
UC150 child charging station
PE conductor
AC connection cable
Ethernet cable connection for external communication
Ethernet cable connection for internal communication between charging station and MastHood
Connection between parent charging station and child charging station
AC AUX cable to charge point
DC cable to charge point
Preparation for connection
No.
1
Open the maintenance door with the 8 mm triangular key
2
Loosen the 3 screws of the plastic cover and remove the cover
3
Hold the deflector and remove the deflector screw
4
Turn the deflector to the side
5
Remove the deflector from the SICHARGE UC MastHood
Installation and Commissioning Checklist for SICHARGE UC
Product Information, 03/2023, A5E52548271-AA
Checklist item
SICHARGE UC MastHood
5.3 Connection
P
F
N/A
49

Advertisement

Table of Contents
loading

Table of Contents