Figure 6-13
No.
5
Compare the expected distance and the actual distance between the anchor point and the mark-
ing of the original anchor point.
6
Repeat steps 4 and 5 until the Pantograph is in the correct position.
Note
Ensure that the Pantograph rails hit the bus roof rails centered. The correct position of the
Pantograph can be checked by lowering the Pantograph in manual mode
Optimal distance (P)
Maximum distance (P1)
Minimum distance (P2)
Figure 6-14
Y sensor adjustment range
Installation and Commissioning Checklist for SICHARGE UC
Product Information, 03/2023, A5E52548271-AA
Tension belt position in direction of the mast
Tension belt position in the direction of the road
Adjusting the pantograph crosswise to the road
Checklist item
SICHARGE UC MastPanto
6.4 Commissioning
P
F
N/A
75