Siemens SICHARGE UC Installation And Commissioning Manual page 57

Hide thumbs Also See for SICHARGE UC:
Table of Contents

Advertisement

SICHARGE UC MastPanto
6.1 Pre-Installation
Construction and approach direction
Approach direction from the left
No.
1
The following figure shows the construction of the contact hood with the approach direction from
the left
① Approach direction from the left
② WLAN antenna
③ Contact rail DC+
Figure 6-1
56
Transport supports
Transport lock of the cantilever arm
Checklist item
Approach direction from the left
④ Contact rail CP
⑤ Contact rail DC-
⑥ Contact rail PE
Installation and Commissioning Checklist for SICHARGE
UC Product Information, 03/2023, A5E52548271-AA
P
F
N/A