Commissioning - Siemens SICHARGE UC Installation And Commissioning Manual

Hide thumbs Also See for SICHARGE UC:
Table of Contents

Advertisement

SICHARGE UC Dispenser

4.4 Commissioning

4.4
Commissioning
Visual Inspection
No.
1
Check if the dispenser shows any signs of damages
2
Check that the shock indicator on the dispenser is still intact and that the serial number of the
shock indicator is the same as in the documentation
3
Take pictures from the installation, equipment and Name Plate
Installation check
No.
1
Ensure that the circuit breaker of the control panel (fan grid) is switched OFF
2
Check that anchor bolts are correctly installed on the dispenser
Software verification
No.
1
Update and write down the installed version of the following components
Siemens controller version
HMI version
EVA Charge SE board
Verification of electrical functionality
No.
1
Check the functionality of:
DC contactors
Check contactor feedback on the dispenser HMI, otherwise on the charger HMI
Switch on
No.
1
Switch on the following switching elements at the SICHARGE UC charging station for the power
supply cable of the SICHARGE UC Dispenser:
Backup fuse
Residual current operated circuit breaker
2
Wait until the SICHARGE UC Dispenser has started up completely. When the display shows the Start
menu, the SICHARGE UC Dispenser is ready for operation
36
Checklist item
Checklist item
Checklist item
Checklist item
Checklist item
Installation and Commissioning Checklist for SICHARGE UC
Product Information, 03/2023, A5E52548271-AA
P
F
N/A
P
F
N/A
P
F
N/A
P
F
N/A
P
F
N/A

Advertisement

Table of Contents
loading

Table of Contents