6.2 Installation - Siemens SICHARGE UC Installation And Commissioning Manual

Hide thumbs Also See for SICHARGE UC:
Table of Contents

Advertisement

SICHARGE UC MastPanto

6.2 Installation

Comments and findings:
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Responsible person
(optional) Customer
Please take into consideration that the document is only valid after signatures of technician or if included in the final
document delivered to the customer.
6.2
Installation
Preparing the mounting area
No.
1
Check that the mounting direction of the mast and the driving direction of the bus correspond
with the installed cable connection in the Pantograph and the antenna cable to the Wifi Antenna
(vertical connection).
2
Calculate the statics for the base to ensure the stability of the SICHARGE UC MastPanto
3
Create base according the static calculation and the interface description below
58
Name
Checklist item
Function
Installation and Commissioning Checklist for SICHARGE
UC Product Information, 03/2023, A5E52548271-AA
Signature
P
F
N/A

Advertisement

Table of Contents
loading

Table of Contents