Siemens SICHARGE UC Installation And Commissioning Manual page 63

Hide thumbs Also See for SICHARGE UC:
Table of Contents

Advertisement

SICHARGE UC MastPanto
6.2 Installation
No.
3
Place a piece of wood or similar under the base of the mast
4
Lift it carefully until the SICHARGE UC MastPanto hangs vertically from the sling gear
① Attachment point crane
② Attachment points mast base
③ Transport supports
④ Transport lock of the cantilever arm
Figure 6-6
Mounting the SICHARGE UC MastPanto
No.
1
Remove the bottom panels on the front and rear
2
Remove the orange strip prior moving the SICHARGE UC MastPanto
3
Transport the SICHARGE UC MastPanto to the base area
4
Position the SICHARGE UC MastPanto over the threaded rods on the base area
5
Guide any underground cables into the mounting base of the SICHARGE UC MastPanto
62
Checklist item
Attachment points
Checklist item
⑤ Mast
⑥ Cantilever arm
⑦ Screw of the cantilever arm serves as pivot
point
⑧ Attachment points connecting rod mounting
points
Installation and Commissioning Checklist for SICHARGE
UC Product Information, 03/2023, A5E52548271-AA
P
F
N/A
P
F
N/A

Advertisement

Table of Contents
loading

Table of Contents