Siemens SICHARGE UC Installation And Commissioning Manual page 29

Hide thumbs Also See for SICHARGE UC:
Table of Contents

Advertisement

SICHARGE UC Dispenser
4.1 Pre-Installation
Unpackaging the dispenser
No.
1
Removing packaging for road transport
Remove transport film
Remove the edge protection strips
Remove spacers
2
Remove packaging for air transport
Remove the screws from the side panel of the packaging
Take off the side panel
Lift off the cover of the transport packaging of the SICHARGE UC Dispenser
3
Remove the packaging for sea transport
Remove the aluminum compound foil
Remove the screws from the side panel of the packaging
Take off the side panel
Lift off the cover of the transport packaging of the SICHARGE UC Dispenser
Comments and findings:
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Responsible person
(optional) Customer
Please take into consideration that the document is only valid after signatures of technician or if included in the final
document delivered to the customer.
28
Checklist item
Name
Function
Installation and Commissioning Checklist for SICHARGE UC
Product Information, 03/2023, A5E52548271-AA
P
F
N/A
Signature

Advertisement

Table of Contents
loading

Table of Contents